Oregon Green (L0655)

Oregon Green is a 40.0 MW other interconnection project with a current status of withdrawn. It is proposed to connect at Forest Grove Substation.

40.0 MWCapacity
WithdrawnStatus
—Market
OtherTechnology

Project facts

Canonical nameOregon Green
Queue IDL0655
Statuswithdrawn
Source statusWITHDRAWN
Market—
TechnologyOther
Capacity40.0 MW
State—
CountyWashington
Point of interconnectionForest Grove Substation
Requested (queue) date2025-06-09
Proposed in-service date2028-06-09
Operational date—
Withdrawn date—
DeveloperCity of Forest Grove
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata