Orient Energy Center Substation (J3553)

Orient Energy Center Substation is a 244.0 MW gas interconnection project in Adair, Iowa with a current status of withdrawn. It is proposed to connect at Orient Energy Center Substation.

244.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameOrient Energy Center Substation
Queue IDJ3553
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity244.0 MW
StateIowa
CountyAdair
Point of interconnectionOrient Energy Center Substation
Requested (queue) date2024-04-18
Proposed in-service date2028-11-30
Operational date2028-11-30
Withdrawn date2025-12-23
Developer
Utility / transmission ownerMIDAMERICAN ENERGY CO.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata