Orion Energy NY I (0157)

Orion Energy NY I is a 100.0 MW wind interconnection project in Herkimer, New York with a current status of withdrawn. It is proposed to connect at Watkins Rd.-Inghams 115kV.

100.0 MWCapacity
WithdrawnStatus
EMarket
WindTechnology

Project facts

Canonical nameOrion Energy NY I
Queue ID0157
Statuswithdrawn
Source status0
MarketE
TechnologyWind
Capacity100.0 MW
StateNew York
CountyHerkimer
Point of interconnectionWatkins Rd.-Inghams 115kV
Requested (queue) date2004-10-12
Proposed in-service date2012-03-01
Operational date
Withdrawn date
DeveloperBP Wind Energy North America, Inc
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata