Other_ (J2293)

Other_ is a 50.0 MW solar interconnection project in Adams, Wisconsin with a current status of withdrawn. It is proposed to connect at Other_.

50.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameOther_
Queue IDJ2293
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity50.0 MW
StateWisconsin
CountyAdams
Point of interconnectionOther_
Requested (queue) date2021-11-30
Proposed in-service date2025-11-30
Operational date2025-11-30
Withdrawn date2024-10-01
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.