Ottumwa Generation - Tri-County 161kV (J4086)

Ottumwa Generation - Tri-County 161kV is a 120.0 MW solar interconnection project in Wapello, Iowa with a current status of operational. It is proposed to connect at Ottumwa Generation - Tri-County 161kV.

120.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameOttumwa Generation - Tri-County 161kV
Queue IDJ4086
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity120.0 MW
StateIowa
CountyWapello
Point of interconnectionOttumwa Generation - Tri-County 161kV
Requested (queue) date2025-10-07
Proposed in-service date2029-06-01
Operational date2029-06-01
Withdrawn date
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata