Overton - McCredie 345kV (J2043)

Overton - McCredie 345kV is a 300.0 MW solar interconnection project in Callaway, Missouri with a current status of withdrawn. It is proposed to connect at Overton - McCredie 345kV.

300.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameOverton - McCredie 345kV
Queue IDJ2043
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity300.0 MW
StateMissouri
CountyCallaway
Point of interconnectionOverton - McCredie 345kV
Requested (queue) date2022-04-05
Proposed in-service date2025-05-01
Operational date2025-05-01
Withdrawn date2025-12-18
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata