Overton - Sedalia East 161 kV Substation is a 20.0 MW solar interconnection project in Cooper, Missouri with a current status of withdrawn. It is proposed to connect at Overton - Sedalia East 161 kV Substation.

20.0 MWCapacity
WithdrawnStatus
MOMarket
SolarTechnology

Project facts

Canonical nameOverton - Sedalia East 161 kV Substation
Queue IDGEN-2024-004
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologySolar
Capacity20.0 MW
StateMissouri
CountyCooper
Point of interconnectionOverton - Sedalia East 161 kV Substation
Requested (queue) date2024-04-25
Proposed in-service date2026-10-01
Operational date
Withdrawn date2024-12-04
Developer
Utility / transmission ownerEvergy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata