PACE Queue Project C004 — Wind in Prairie, Montana

PACE Queue Project C004 — Wind in Prairie, Montana is a 750.0 MW wind interconnection project in Prairie, Montana with a current status of active. It is proposed to connect at Colstrip substation.

750.0 MWCapacity
ActiveStatus
PACEMarket
WindTechnology

Project facts

Canonical namePACE Queue Project C004 — Wind in Prairie, Montana
Queue IDC004
Statusactive
Source statusIn Progress
MarketPACE
TechnologyWind
Capacity750.0 MW
StateMontana
CountyPrairie
Point of interconnectionColstrip substation
Requested (queue) date2018-09-17
Proposed in-service date2021-09-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-10-05
Data last materially changed2026-10-05
Page data generated2026-10-11

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.