PACE Queue Project C009 — Wind in Carter, Montana

PACE Queue Project C009 — Wind in Carter, Montana is a 400.0 MW wind interconnection project in Carter, Montana with a current status of active. It is proposed to connect at Colstrip substation.

400.0 MWCapacity
ActiveStatus
PACEMarket
WindTechnology

Project facts

Canonical namePACE Queue Project C009 — Wind in Carter, Montana
Queue IDC009
Statusactive
Source statusIn Progress
MarketPACE
TechnologyWind
Capacity400.0 MW
StateMontana
CountyCarter
Point of interconnectionColstrip substation
Requested (queue) date2019-06-14
Proposed in-service date2022-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata