PACE Queue Project C010 — Wind in Rosebud, Montana

PACE Queue Project C010 — Wind in Rosebud, Montana is a 500.0 MW wind interconnection project in Rosebud, Montana with a current status of withdrawn. It is proposed to connect at Colstrip substation.

500.0 MWCapacity
WithdrawnStatus
PACEMarket
WindTechnology

Project facts

Canonical namePACE Queue Project C010 — Wind in Rosebud, Montana
Queue IDC010
Statuswithdrawn
Source statusDeactivated
MarketPACE
TechnologyWind
Capacity500.0 MW
StateMontana
CountyRosebud
Point of interconnectionColstrip substation
Requested (queue) date2019-10-23
Proposed in-service date2024-09-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata