PACE Queue Project C012 — Wind in Wheatland, Montana
PACE Queue Project C012 — Wind in Wheatland, Montana is a 750.0 MW wind interconnection project in Wheatland, Montana with a current status of active. It is proposed to connect at Loco Mountain substation.
750.0 MWCapacity
ActiveStatus
PACEMarket
WindTechnology
Project facts
| Canonical name | PACE Queue Project C012 — Wind in Wheatland, Montana |
|---|---|
| Queue ID | C012 |
| Status | active |
| Source status | In Progress |
| Market | PACE |
| Technology | Wind |
| Capacity | 750.0 MW |
| State | Montana |
| County | Wheatland |
| Point of interconnection | Loco Mountain substation |
| Requested (queue) date | 2020-07-31 |
| Proposed in-service date | 2023-10-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata