PACE Queue Project C013 — Wind in Meagher, Montana

PACE Queue Project C013 — Wind in Meagher, Montana is a 326.2 MW wind interconnection project in Meagher, Montana with a current status of active. It is proposed to connect at Loco Mountain substation.

326.2 MWCapacity
ActiveStatus
PACEMarket
WindTechnology

Project facts

Canonical namePACE Queue Project C013 — Wind in Meagher, Montana
Queue IDC013
Statusactive
Source statusIn Progress
MarketPACE
TechnologyWind
Capacity326.2 MW
StateMontana
CountyMeagher
Point of interconnectionLoco Mountain substation
Requested (queue) date2021-01-28
Proposed in-service date2024-12-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata