PACE Queue Project C2-111 — Solar in Natrona, Wyoming
PACE Queue Project C2-111 — Solar in Natrona, Wyoming is a 199.0 MW solar interconnection project in Natrona, Wyoming with a current status of withdrawn. It is proposed to connect at Casper substation.
199.0 MWCapacity
WithdrawnStatus
PACEMarket
SolarTechnology
Project facts
| Canonical name | PACE Queue Project C2-111 — Solar in Natrona, Wyoming |
|---|---|
| Queue ID | C2-111 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | PACE |
| Technology | Solar |
| Capacity | 199.0 MW |
| State | Wyoming |
| County | Natrona |
| Point of interconnection | Casper substation |
| Requested (queue) date | 2022-05-13 |
| Proposed in-service date | 2025-12-21 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata