PACE Queue Project C2-32 — Other in Lincoln, Wyoming

PACE Queue Project C2-32 — Other in Lincoln, Wyoming is a 500.0 MW other interconnection project in Lincoln, Wyoming with a current status of active. It is proposed to connect at Naughton substation.

500.0 MWCapacity
ActiveStatus
PACEMarket
OtherTechnology

Project facts

Canonical namePACE Queue Project C2-32 — Other in Lincoln, Wyoming
Queue IDC2-32
Statusactive
Source statusIn Progress
MarketPACE
TechnologyOther
Capacity500.0 MW
StateWyoming
CountyLincoln
Point of interconnectionNaughton substation
Requested (queue) date2022-04-26
Proposed in-service date2030-11-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-17proposed_online_date2031-08-062030-11-01medium
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata