PACE Queue Project C2-45 — Solar+Battery in Power, Idaho

PACE Queue Project C2-45 — Solar+Battery in Power, Idaho is a 600.0 MW solar+battery interconnection project in Power, Idaho with a current status of active. It is proposed to connect at Borah substation.

600.0 MWCapacity
ActiveStatus
PACEMarket
Solar+BatteryTechnology

Project facts

Canonical namePACE Queue Project C2-45 — Solar+Battery in Power, Idaho
Queue IDC2-45
Statusactive
Source statusIn Progress
MarketPACE
TechnologySolar+Battery
Capacity600.0 MW
StateIdaho
CountyPower
Point of interconnectionBorah substation
Requested (queue) date2022-04-28
Proposed in-service date2030-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata