PACE Queue Project C2-48 — Gas in Lincoln, Wyoming

PACE Queue Project C2-48 — Gas in Lincoln, Wyoming is a 48.0 MW gas interconnection project in Lincoln, Wyoming with a current status of active. It is proposed to connect at Naughton substation.

48.0 MWCapacity
ActiveStatus
PACEMarket
GasTechnology

Project facts

Canonical namePACE Queue Project C2-48 — Gas in Lincoln, Wyoming
Queue IDC2-48
Statusactive
Source statusIn Progress
MarketPACE
TechnologyGas
Capacity48.0 MW
StateWyoming
CountyLincoln
Point of interconnectionNaughton substation
Requested (queue) date2022-05-03
Proposed in-service date2031-04-16
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata