PACE Queue Project C2-92 — Wind in Bingham, Idaho

PACE Queue Project C2-92 — Wind in Bingham, Idaho is a 206.0 MW wind interconnection project in Bingham, Idaho with a current status of suspended. It is proposed to connect at Antelope-Goshen transmission line.

206.0 MWCapacity
SuspendedStatus
PACEMarket
WindTechnology

Project facts

Canonical namePACE Queue Project C2-92 — Wind in Bingham, Idaho
Queue IDC2-92
Statussuspended
Source statusSuspended
MarketPACE
TechnologyWind
Capacity206.0 MW
StateIdaho
CountyBingham
Point of interconnectionAntelope-Goshen transmission line
Requested (queue) date2022-05-12
Proposed in-service date2026-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectsuspendedhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata