PACE Queue Project C3-020 — Solar+Battery in Albany, Wyoming

PACE Queue Project C3-020 — Solar+Battery in Albany, Wyoming is a 80.0 MW solar+battery interconnection project in Albany, Wyoming with a current status of withdrawn. It is proposed to connect at Ft. Sanders substation.

80.0 MWCapacity
WithdrawnStatus
PACEMarket
Solar+BatteryTechnology

Project facts

Canonical namePACE Queue Project C3-020 — Solar+Battery in Albany, Wyoming
Queue IDC3-020
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologySolar+Battery
Capacity80.0 MW
StateWyoming
CountyAlbany
Point of interconnectionFt. Sanders substation
Requested (queue) date2023-04-28
Proposed in-service date2026-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata