PACE Queue Project C3-157 — Solar in Bingham, Idaho

PACE Queue Project C3-157 — Solar in Bingham, Idaho is a 100.0 MW solar interconnection project in Bingham, Idaho with a current status of withdrawn. It is proposed to connect at Antelope - Goshen transmission line.

100.0 MWCapacity
WithdrawnStatus
PACEMarket
SolarTechnology

Project facts

Canonical namePACE Queue Project C3-157 — Solar in Bingham, Idaho
Queue IDC3-157
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologySolar
Capacity100.0 MW
StateIdaho
CountyBingham
Point of interconnectionAntelope - Goshen transmission line
Requested (queue) date2023-05-15
Proposed in-service date2028-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata