PACE Queue Project C4-029 — Solar+Battery in Caribou, Idaho is a 150.0 MW solar+battery interconnection project in Caribou, Idaho with a current status of withdrawn. It is proposed to connect at Fish Creek substation.

150.0 MWCapacity
WithdrawnStatus
PACEMarket
Solar+BatteryTechnology

Project facts

Canonical namePACE Queue Project C4-029 — Solar+Battery in Caribou, Idaho
Queue IDC4-029
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologySolar+Battery
Capacity150.0 MW
StateIdaho
CountyCaribou
Point of interconnectionFish Creek substation
Requested (queue) date2024-05-13
Proposed in-service date2029-12-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata