PACE Queue Project C4-036 — Wind in Carbon, Wyoming

PACE Queue Project C4-036 — Wind in Carbon, Wyoming is a 310.2 MW wind interconnection project in Carbon, Wyoming with a current status of withdrawn. It is proposed to connect at Heward substation.

310.2 MWCapacity
WithdrawnStatus
PACEMarket
WindTechnology

Project facts

Canonical namePACE Queue Project C4-036 — Wind in Carbon, Wyoming
Queue IDC4-036
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologyWind
Capacity310.2 MW
StateWyoming
CountyCarbon
Point of interconnectionHeward substation
Requested (queue) date2024-05-14
Proposed in-service date2031-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata