PACE Queue Project FT012 — Solar+Battery in Bannock, Idaho

PACE Queue Project FT012 — Solar+Battery in Bannock, Idaho is a 2.0 MW solar+battery interconnection project in Bannock, Idaho with a current status of withdrawn. It is proposed to connect at McCammon - Downey transmission line.

2.0 MWCapacity
WithdrawnStatus
PACEMarket
Solar+BatteryTechnology

Project facts

Canonical namePACE Queue Project FT012 — Solar+Battery in Bannock, Idaho
Queue IDFT012
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologySolar+Battery
Capacity2.0 MW
StateIdaho
CountyBannock
Point of interconnectionMcCammon - Downey transmission line
Requested (queue) date2024-10-17
Proposed in-service date2025-04-30
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata