PACE Queue Project IS002 — Wind in Laramie, Wyoming

PACE Queue Project IS002 — Wind in Laramie, Wyoming is a 600.0 MW wind interconnection project in Laramie, Wyoming with a current status of operational. It is proposed to connect at Aeolus substation.

600.0 MWCapacity
OperationalStatus
PACEMarket
WindTechnology

Project facts

Canonical namePACE Queue Project IS002 — Wind in Laramie, Wyoming
Queue IDIS002
Statusoperational
Source statusComplete
MarketPACE
TechnologyWind
Capacity600.0 MW
StateWyoming
CountyLaramie
Point of interconnectionAeolus substation
Requested (queue) date2016-12-05
Proposed in-service date
Operational date2024-12-01
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata