PACE Queue Project IS007 — Wind in Uinta, Wyoming

PACE Queue Project IS007 — Wind in Uinta, Wyoming is a 150.0 MW wind interconnection project in Uinta, Wyoming with a current status of withdrawn. It is proposed to connect at Long Hollow substation.

150.0 MWCapacity
WithdrawnStatus
PACEMarket
WindTechnology

Project facts

Canonical namePACE Queue Project IS007 — Wind in Uinta, Wyoming
Queue IDIS007
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologyWind
Capacity150.0 MW
StateWyoming
CountyUinta
Point of interconnectionLong Hollow substation
Requested (queue) date2021-12-30
Proposed in-service date2026-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata