PACE Queue Project IS009 — Battery in Converse, Wyoming

PACE Queue Project IS009 — Battery in Converse, Wyoming is a 400.0 MW battery interconnection project in Converse, Wyoming with a current status of withdrawn. It is proposed to connect at Windstar substation.

400.0 MWCapacity
WithdrawnStatus
PACEMarket
BatteryTechnology

Project facts

Canonical namePACE Queue Project IS009 — Battery in Converse, Wyoming
Queue IDIS009
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologyBattery
Capacity400.0 MW
StateWyoming
CountyConverse
Point of interconnectionWindstar substation
Requested (queue) date2022-02-10
Proposed in-service date2026-12-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata