PACE Queue Project IS011 — Solar in Park, Wyoming

PACE Queue Project IS011 — Solar in Park, Wyoming is a 200.0 MW solar interconnection project in Park, Wyoming with a current status of withdrawn. It is proposed to connect at Frannie substation.

200.0 MWCapacity
WithdrawnStatus
PACEMarket
SolarTechnology

Project facts

Canonical namePACE Queue Project IS011 — Solar in Park, Wyoming
Queue IDIS011
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologySolar
Capacity200.0 MW
StateWyoming
CountyPark
Point of interconnectionFrannie substation
Requested (queue) date2022-06-30
Proposed in-service date2027-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata