PACE Queue Project IS016 — Solar+Battery in Elmore, Idaho
PACE Queue Project IS016 — Solar+Battery in Elmore, Idaho is a 330.0 MW solar+battery interconnection project in Elmore, Idaho with a current status of withdrawn. It is proposed to connect at Midpoint Hemingway transmission line.
330.0 MWCapacity
WithdrawnStatus
PACEMarket
Solar+BatteryTechnology
Project facts
| Canonical name | PACE Queue Project IS016 — Solar+Battery in Elmore, Idaho |
|---|---|
| Queue ID | IS016 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | PACE |
| Technology | Solar+Battery |
| Capacity | 330.0 MW |
| State | Idaho |
| County | Elmore |
| Point of interconnection | Midpoint Hemingway transmission line |
| Requested (queue) date | 2024-03-26 |
| Proposed in-service date | 2027-11-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.