PACE Queue Project IS017 — Wind in Carbon, Wyoming

PACE Queue Project IS017 — Wind in Carbon, Wyoming is a 492.5 MW wind interconnection project in Carbon, Wyoming with a current status of withdrawn. It is proposed to connect at Heward substation.

492.5 MWCapacity
WithdrawnStatus
PACEMarket
WindTechnology

Project facts

Canonical namePACE Queue Project IS017 — Wind in Carbon, Wyoming
Queue IDIS017
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologyWind
Capacity492.5 MW
StateWyoming
CountyCarbon
Point of interconnectionHeward substation
Requested (queue) date2024-08-16
Proposed in-service date2031-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.