PACE Queue Project IS017 — Wind in Carbon, Wyoming
PACE Queue Project IS017 — Wind in Carbon, Wyoming is a 492.5 MW wind interconnection project in Carbon, Wyoming with a current status of withdrawn. It is proposed to connect at Heward substation.
492.5 MWCapacity
WithdrawnStatus
PACEMarket
WindTechnology
Project facts
| Canonical name | PACE Queue Project IS017 — Wind in Carbon, Wyoming |
|---|---|
| Queue ID | IS017 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | PACE |
| Technology | Wind |
| Capacity | 492.5 MW |
| State | Wyoming |
| County | Carbon |
| Point of interconnection | Heward substation |
| Requested (queue) date | 2024-08-16 |
| Proposed in-service date | 2031-07-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata