PACE Queue Project S0022 — Wind in Bingham, Idaho

PACE Queue Project S0022 — Wind in Bingham, Idaho is a 151.8 MW wind interconnection project in Bingham, Idaho with a current status of active. It is proposed to connect at Basalt substation.

151.8 MWCapacity
ActiveStatus
PACEMarket
WindTechnology

Project facts

Canonical namePACE Queue Project S0022 — Wind in Bingham, Idaho
Queue IDS0022
Statusactive
Source statusIn Progress
MarketPACE
TechnologyWind
Capacity151.8 MW
StateIdaho
CountyBingham
Point of interconnectionBasalt substation
Requested (queue) date2023-10-17
Proposed in-service date2027-10-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata