PACE Queue Project T2-036 — Wind in Sweetwater, Wyoming

PACE Queue Project T2-036 — Wind in Sweetwater, Wyoming is a 300.0 MW wind interconnection project in Sweetwater, Wyoming with a current status of withdrawn. It is proposed to connect at Anticline substation.

300.0 MWCapacity
WithdrawnStatus
PACEMarket
WindTechnology

Project facts

Canonical namePACE Queue Project T2-036 — Wind in Sweetwater, Wyoming
Queue IDT2-036
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologyWind
Capacity300.0 MW
StateWyoming
CountySweetwater
Point of interconnectionAnticline substation
Requested (queue) date2025-09-10
Proposed in-service date2027-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata