Pacific Northwest Renewable Energy's 22 MW Load (L0599)
Pacific Northwest Renewable Energy's 22 MW Load is a 14.5 MW other interconnection project in Grays Harbor, Washington with a current status of active. It is proposed to connect at Aberdeen Substation.
14.5 MWCapacity
ActiveStatus
WAMarket
OtherTechnology
Project facts
| Canonical name | Pacific Northwest Renewable Energy's 22 MW Load |
|---|---|
| Queue ID | L0599 |
| Status | active |
| Source status | STUDY COMPLETED |
| Market | WA |
| Technology | Other |
| Capacity | 14.5 MW |
| State | Washington |
| County | Grays Harbor |
| Point of interconnection | Aberdeen Substation |
| Requested (queue) date | 2024-03-25 |
| Proposed in-service date | 2025-10-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Public Utility District No. 1 of Cowlitz County |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.