PACW Queue Project C1-37 — Solar+Battery in Kittitas, Washington

PACW Queue Project C1-37 — Solar+Battery in Kittitas, Washington is a 199.0 MW solar+battery interconnection project in Kittitas, Washington with a current status of active. It is proposed to connect at Pomona-Vantage transmission line.

199.0 MWCapacity
ActiveStatus
PACWMarket
Solar+BatteryTechnology

Project facts

Canonical namePACW Queue Project C1-37 — Solar+Battery in Kittitas, Washington
Queue IDC1-37
Statusactive
Source statusIn Progress
MarketPACW
TechnologySolar+Battery
Capacity199.0 MW
StateWashington
CountyKittitas
Point of interconnectionPomona-Vantage transmission line
Requested (queue) date2021-05-14
Proposed in-service date2024-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata