PACW Queue Project C2-162 — Solar+Battery in Yakima, Washington
PACW Queue Project C2-162 — Solar+Battery in Yakima, Washington is a 86.0 MW solar+battery interconnection project in Yakima, Washington with a current status of suspended. It is proposed to connect at Tieton substation.
86.0 MWCapacity
SuspendedStatus
PACWMarket
Solar+BatteryTechnology
Project facts
| Canonical name | PACW Queue Project C2-162 — Solar+Battery in Yakima, Washington |
|---|---|
| Queue ID | C2-162 |
| Status | suspended |
| Source status | Suspended |
| Market | PACW |
| Technology | Solar+Battery |
| Capacity | 86.0 MW |
| State | Washington |
| County | Yakima |
| Point of interconnection | Tieton substation |
| Requested (queue) date | 2022-05-15 |
| Proposed in-service date | 2024-11-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | suspended | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata