PACW Queue Project C2-193 — Battery in Yakima, Washington is a 40.0 MW battery interconnection project in Yakima, Washington with a current status of withdrawn. It is proposed to connect at Union Gap substation.

40.0 MWCapacity
WithdrawnStatus
PACWMarket
BatteryTechnology

Project facts

Canonical namePACW Queue Project C2-193 — Battery in Yakima, Washington
Queue IDC2-193
Statuswithdrawn
Source statusWithdrawn
MarketPACW
TechnologyBattery
Capacity40.0 MW
StateWashington
CountyYakima
Point of interconnectionUnion Gap substation
Requested (queue) date2022-05-15
Proposed in-service date2027-03-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata