PACW Queue Project C3-019 — Other in Walla Walla, Washington is a 10.4 MW other interconnection project in Walla Walla, Washington with a current status of withdrawn. It is proposed to connect at Wallula substation.

10.4 MWCapacity
WithdrawnStatus
PACWMarket
OtherTechnology

Project facts

Canonical namePACW Queue Project C3-019 — Other in Walla Walla, Washington
Queue IDC3-019
Statuswithdrawn
Source statusWithdrawn
MarketPACW
TechnologyOther
Capacity10.4 MW
StateWashington
CountyWalla Walla
Point of interconnectionWallula substation
Requested (queue) date2023-04-28
Proposed in-service date2025-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata