PACW Queue Project C3-032 — Wind in Cowlitz, Washington

PACW Queue Project C3-032 — Wind in Cowlitz, Washington is a 150.0 MW wind interconnection project in Cowlitz, Washington with a current status of withdrawn. It is proposed to connect at Merwin - Kalama - Cardwell line.

150.0 MWCapacity
WithdrawnStatus
PACWMarket
WindTechnology

Project facts

Canonical namePACW Queue Project C3-032 — Wind in Cowlitz, Washington
Queue IDC3-032
Statuswithdrawn
Source statusWithdrawn
MarketPACW
TechnologyWind
Capacity150.0 MW
StateWashington
CountyCowlitz
Point of interconnectionMerwin - Kalama - Cardwell line
Requested (queue) date2023-05-04
Proposed in-service date2027-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata