PACW Queue Project C3-067 — Battery in Grant, Washington

PACW Queue Project C3-067 — Battery in Grant, Washington is a 500.0 MW battery interconnection project in Grant, Washington with a current status of withdrawn. It is proposed to connect at Vantage - Pomona Heights transmission line.

500.0 MWCapacity
WithdrawnStatus
PACWMarket
BatteryTechnology

Project facts

Canonical namePACW Queue Project C3-067 — Battery in Grant, Washington
Queue IDC3-067
Statuswithdrawn
Source statusWithdrawn
MarketPACW
TechnologyBattery
Capacity500.0 MW
StateWashington
CountyGrant
Point of interconnectionVantage - Pomona Heights transmission line
Requested (queue) date2023-05-11
Proposed in-service date2030-01-04
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata