Paddtown I Wind 1500 MW (T92)

Paddtown I Wind 1500 MW is a 1,500.0 MW wind interconnection project in Pocahontas, Iowa with a current status of withdrawn.

1,500.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical namePaddtown I Wind 1500 MW
Queue IDT92
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity1,500.0 MW
StateIowa
CountyPocahontas
Point of interconnection
Requested (queue) date2007-10-23
Proposed in-service date2010-08-01
Operational date
Withdrawn date2009-09-16
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata