PAHRUMP SOLAR (1342)
PAHRUMP SOLAR is a 86.5 MW solar interconnection project in Nye, Nevada with a current status of withdrawn. It is proposed to connect at Vista Substation 138 kV bus..
86.5 MWCapacity
WithdrawnStatus
—Market
SolarTechnology
Project facts
| Canonical name | PAHRUMP SOLAR |
|---|---|
| Queue ID | 1342 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | — |
| Technology | Solar |
| Capacity | 86.5 MW |
| State | Nevada |
| County | Nye |
| Point of interconnection | Vista Substation 138 kV bus. |
| Requested (queue) date | 2016-05-02 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2016-07-19 |
| Developer | — |
| Utility / transmission owner | VEA |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata