PALMAS C5 (940)

PALMAS C5 is a 238.0 MW solar interconnection project in Hyder, Arizona with a current status of withdrawn. It is proposed to connect at Hassayampa-North Gila 500kV Line.

238.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical namePALMAS C5
Queue ID940
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity238.0 MW
StateArizona
CountyHyder
Point of interconnectionHassayampa-North Gila 500kV Line
Requested (queue) date2012-04-02
Proposed in-service date
Operational date
Withdrawn date2012-06-15
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata