Passadumkeag Wind CNR (1018)

Passadumkeag Wind CNR is a 40.0 MW wind interconnection project in Peneobscot, Maine with a current status of operational. It is proposed to connect at Interconnection shall be at the point where the leads from the switch located on the high side of the 115 kV/34.5 kV transformer connect into the 115 kV ring bus at the Passadumkeag Substation in Greenbush, Maine.

40.0 MWCapacity
OperationalStatus
BHEMarket
WindTechnology

Project facts

Canonical namePassadumkeag Wind CNR
Queue ID1018
Statusoperational
Source statusC
MarketBHE
TechnologyWind
Capacity40.0 MW
StateMaine
CountyPeneobscot
Point of interconnectionInterconnection shall be at the point where the leads from the switch located on the high side of the 115 kV/34.5 kV transformer connect into the 115 kV ring bus at the Passadumkeag Substation in Greenbush, Maine
Requested (queue) date2020-04-24
Proposed in-service date
Operational date2021-11-15
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata