Passadumkeag Wind CNR (1018)
Passadumkeag Wind CNR is a 40.0 MW wind interconnection project in Peneobscot, Maine with a current status of operational. It is proposed to connect at Interconnection shall be at the point where the leads from the switch located on the high side of the 115 kV/34.5 kV transformer connect into the 115 kV ring bus at the Passadumkeag Substation in Greenbush, Maine.
40.0 MWCapacity
OperationalStatus
BHEMarket
WindTechnology
Project facts
| Canonical name | Passadumkeag Wind CNR |
|---|---|
| Queue ID | 1018 |
| Status | operational |
| Source status | C |
| Market | BHE |
| Technology | Wind |
| Capacity | 40.0 MW |
| State | Maine |
| County | Peneobscot |
| Point of interconnection | Interconnection shall be at the point where the leads from the switch located on the high side of the 115 kV/34.5 kV transformer connect into the 115 kV ring bus at the Passadumkeag Substation in Greenbush, Maine |
| Requested (queue) date | 2020-04-24 |
| Proposed in-service date | — |
| Operational date | 2021-11-15 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata