Passadumkeag Wind CNR only (633)

Passadumkeag Wind CNR only is a 40.0 MW wind interconnection project in Penobscot, Maine with a current status of operational. It is proposed to connect at Existing connection between Emera Maine 115kV lines 64 and 97.

40.0 MWCapacity
OperationalStatus
BHEMarket
WindTechnology

Project facts

Canonical namePassadumkeag Wind CNR only
Queue ID633
Statusoperational
Source statusC
MarketBHE
TechnologyWind
Capacity40.0 MW
StateMaine
CountyPenobscot
Point of interconnectionExisting connection between Emera Maine 115kV lines 64 and 97
Requested (queue) date2017-04-06
Proposed in-service date
Operational date2019-06-28
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata