Patent Gate Substation 345 kV (GEN-2020-091)

Patent Gate Substation 345 kV is a 150.0 MW solar interconnection project in McKenzie, North Dakota with a current status of withdrawn. It is proposed to connect at Patent Gate Substation 345 kV.

150.0 MWCapacity
WithdrawnStatus
NDMarket
SolarTechnology

Project facts

Canonical namePatent Gate Substation 345 kV
Queue IDGEN-2020-091
Statuswithdrawn
Source statusWITHDRAWN
MarketND
TechnologySolar
Capacity150.0 MW
StateNorth Dakota
CountyMcKenzie
Point of interconnectionPatent Gate Substation 345 kV
Requested (queue) date2020-04-30
Proposed in-service date2029-12-29
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata