Peach Bottom-Rock Springs 500kV (U2-074)

Peach Bottom-Rock Springs 500kV is a 650.0 MW gas interconnection project in Lancaster, Pennsylvania with a current status of withdrawn.

650.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical namePeach Bottom-Rock Springs 500kV
Queue IDU2-074
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity650.0 MW
StatePennsylvania
CountyLancaster
Point of interconnection
Requested (queue) date2008-07-24
Proposed in-service date2012-10-01
Operational date
Withdrawn date2012-08-03
Developer
Utility / transmission ownerPECO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata