Peddler (J4055)

Peddler is a 198.0 MW wind interconnection project in Ionia, Michigan with a current status of withdrawn. It is proposed to connect at Peddler.

198.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical namePeddler
Queue IDJ4055
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity198.0 MW
StateMichigan
CountyIonia
Point of interconnectionPeddler
Requested (queue) date2025-08-29
Proposed in-service date2027-09-01
Operational date2027-09-01
Withdrawn date2026-09-01
Developer—
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-14withdrawn_date—2026-09-01high
2026-10-14statusoperationalwithdrawnhigh
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata