Pemberton 12kV (W3-036)

Pemberton 12kV is a 5.0 MW solar interconnection project in Wicomico, Maryland with a current status of withdrawn.

5.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical namePemberton 12kV
Queue IDW3-036
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity5.0 MW
StateMaryland
CountyWicomico
Point of interconnection
Requested (queue) date2010-08-31
Proposed in-service date2012-03-01
Operational date
Withdrawn date2011-03-02
Developer
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.