Pemberton 138 kV (AI1-096)

Pemberton 138 kV is a 42.0 MW solar interconnection project in N/a, West Virginia with a current status of withdrawn.

42.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical namePemberton 138 kV
Queue IDAI1-096
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity42.0 MW
StateWest Virginia
CountyN/a
Point of interconnection
Requested (queue) date2022-08-23
Proposed in-service date2027-05-01
Operational date
Withdrawn date2025-10-06
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.