Pequest River-Richmond 34.5 kV (AF1-133)

Pequest River-Richmond 34.5 kV is a 20.0 MW solar interconnection project in Northampton, Pennsylvania with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical namePequest River-Richmond 34.5 kV
Queue IDAF1-133
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity20.0 MW
StatePennsylvania
CountyNorthampton
Point of interconnection
Requested (queue) date2019-09-18
Proposed in-service date2023-02-28
Operational date
Withdrawn date2023-06-09
Developer
Utility / transmission ownerME

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata