Petersburg 345kV Substation (R1011)

Petersburg 345kV Substation is a 250.0 MW generation interconnection project with a current status of operational. It is proposed to connect at Petersburg 345kV Substation.

250.0 MWCapacity
OperationalStatus
Market
GenerationTechnology

Project facts

Canonical namePetersburg 345kV Substation
Queue IDR1011
Statusoperational
Source statusDone
Market
TechnologyGeneration
Capacity250.0 MW
State
CountyPike
Point of interconnectionPetersburg 345kV Substation
Requested (queue) date2021-10-04
Proposed in-service date2024-01-15
Operational date2024-01-15
Withdrawn date
Developer
Utility / transmission ownerINDIANAPOLIS POWER & LIGHT COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.