Phillips Substation (L0374)

Phillips Substation is a 25.0 MW other interconnection project in Benton, Washington with a current status of withdrawn. It is proposed to connect at Franklin-Hedges 115kV.

25.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical namePhillips Substation
Queue IDL0374
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity25.0 MW
StateWashington
CountyBenton
Point of interconnectionFranklin-Hedges 115kV
Requested (queue) date2014-07-07
Proposed in-service date2017-10-01
Operational date
Withdrawn date
DeveloperPublic Utility District No. 1 of Cowlitz County
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata